Wednesday, June 13, 2012
Peterbilt-18Wheels of Steel
Optimus Prime
Transparent 3D Draw
Drum Brake
How It Work
Install the Drum
Engine and Transmission
Transmission
Punch Machine.
Punch the holes for the gas tank.
Roll Process
Welding Process
Welding...
Using DC to melt to the wire
The robot welded the gas tank.
Because the gas tank need to be very precise welding to avoid leaking.
The laser beam read the position of the seam that needed to be welded
To avoid the distortion of the metal, so two manipulators welded simultaneously.
The result is the perfect seam.
CAD
Using the clay to build the real size of the truck
Assembly the chassis
Assembly the chassis
Install the axle
Upside down the chassis
Paint
Glue the panel
Bonding them together
Join them together
Open the mold !!
Finish~
Typing Process
Painting ~ ~
Truck Cab !! Interior and Sleeper
Engine Hood
Assembly the dashboard
Test the dashboard
Peterbilt may use the digital LCD ,like the "Glass Cockpit", which would be easier to read.
Chassis
Truck Cab
Engine Assembly
Bolt it up
Install Gas Tank
Tighten it up
Tire Installation
Tire Installation
Ready to install Truck Cab
The bottom of truck cab
Marriage
Install Exhaust Pipe
Install Engine Hood
Ready to GO !!!!!!
Hit on the Road !!!!!!
18 Wheels of Steel ~ America Long Haul ~
Those Heavy-Duty Trucks are like Blood Cell to our body.
Analogies Test:
1.Truck:Highway =
(A) Blood Cell:Blood Vessel
(B) Sound:Medium
(C) Water:Xylem
Ans:A
2.Truck:Goods =
(A) Electricity:Wire
(B) Blood Cell:Energy
(C) Xylem:Water
Ans:B
[Highlights]
Drum Brake
Gasoline Tank Manufacturing Process
[Questions]
Digital Dashboard (like Glass Cockpit)
Labels:
Peterbilt
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment