Wednesday, June 13, 2012

Peterbilt-18Wheels of Steel


Optimus Prime



Transparent 3D Draw

Drum Brake

How It Work

Install the Drum

Engine and Transmission

Transmission

Punch Machine.

Punch the holes for the gas tank.

Roll Process

Welding Process

Welding...





Using DC to melt to the wire





The robot welded the gas tank.

Because the gas tank need to be very precise welding to avoid leaking.

The laser beam read the position of the seam that needed to be welded





To avoid the distortion of the metal, so two manipulators welded simultaneously.

The result is the perfect seam.

CAD

Using the clay to build the real size of the truck







Assembly the chassis

Assembly the chassis

Install the axle

Upside down the chassis

Paint

Glue the panel

Bonding them together

Join them together



Open the mold !!

Finish~

Typing Process

Painting ~ ~

Truck Cab !! Interior and Sleeper

Engine Hood

Assembly the dashboard

Test the dashboard
Peterbilt may use the digital LCD ,like the "Glass Cockpit", which would be easier to read.

Chassis

Truck Cab

Engine Assembly



Bolt it up

Install Gas Tank

Tighten it up

Tire Installation

Tire Installation

Ready to install Truck Cab

The bottom of truck cab

Marriage



Install Exhaust Pipe

Install Engine Hood

Ready to GO !!!!!!

Hit on the Road !!!!!!

                                             18 Wheels of Steel ~ America Long Haul ~

Those Heavy-Duty Trucks are like Blood Cell to our body.

Analogies Test:
1.Truck:Highway =
   (A) Blood Cell:Blood Vessel
   (B) Sound:Medium
   (C) Water:Xylem

   Ans:A

2.Truck:Goods =
   (A) Electricity:Wire
   (B) Blood Cell:Energy
   (C) Xylem:Water

   Ans:B


[Highlights]
Drum Brake
Gasoline Tank Manufacturing Process

[Questions]
Digital Dashboard (like Glass Cockpit)

No comments:

Post a Comment